North Hall Church Lane Preston Candover Hampshire RG25 2EN
Variation of Condition 1 of 21/03854/FUL - Refurbishment of main house including erection of a new orangery, extensions and alterations to existing Service Wing including merging separate self-contained flat with the main house to create one dwelling. Restoration of coach house and two storey extension, extension and alterations to existing garage block and formation of new stables. Demolition of modern barns and erection of new traditional barn. New tennis court, garden building, glass house and landscaping. Reinstatement of original driveway approach, new walling and entrance gates. Erection of solar panels and associated plant. Change of use of part of land from agricultural to residential (to include annex within traditional barn and tennis court) - Amended to incl. 4 proposed windows to the Stables and relocation of staircase, kitchen and Living room of Coach House.
Greenbrier Harts Lane Burghclere Hampshire RG20 9HF
Erection of a single storey rear extension following demolition of existing conservatory, conversion of garage to additional living space and first floor front gable extension. Replacement bay window and new front door canopy. Alterations to fenestration including replacement windows/doors and addition of a new bay window to replace existing garage door, replacement of external materials to render/cladding and replacement rooflights. (amended)
Haldene Bramley Lane Bramley RG26 5AA
Erection of two storey rear extension, single storey rear extension with conversion of garage to living accommodation, demolition of single storey extension and erection of a front porch. Alterations to external facade of house and replacement windows and doors
9 Bexmoor Way Old Basing RG24 7BL
Erection of two storey side extension, single storey rear and front and side extensions. External alterations to cladding and fenestration. Demolition of existing porch and garage
2 Oak Close Oakley RG23 7DD
Erection of two storey side and single storey rear extensions with associated alterations, following demolition of existing garage, utility and first floor bedroom. Construction of new porch and bay window to front elevation.