37 Heddon Court Avenue Barnet EN4 9NG
Demolition of existing conservatory and construction of a lower ground floor rear extension including patio above with associated handrails and steps to garden. First floor side extension with associated alterations to roof, new rear dormer window and 1no. rooflight to front roofslope
9 Cenacle Close London NW3 7UE
Single and two storey front, side, and rear extensions, including lower ground floor below ground floor terrace and infilling of first floor flat roof area. First floor rear extension with terrace with glass balustrades. New rear terraces at first floor level with glass balustrades. Conversion of garage into habitable room including new window to replace existing door. Demolition of existing gazebo and construction of new garden terraces with associated steps and balustrades. Insertion of rooflight to rear roofslope. Relocation of main entrance and alterations to fenestration.
61 Uphill Grove London NW7 4NH
Part single, part two-storey front and side extension including extension to existing integral garage with new double doors and mono pitched roof. New front porch with added columns and canopy. Part single, part two-storey rear extension including construction of a rear conservatory following demolition of existing porch to side elevation. Associated alterations to windows and doors and additional access steps with balustrade to rear elevation following removal of 1no existing chimney and existing tree to rear garden
The Bobath Centre 250 East End Road London N2 8AU
Amendment to include, Variation of conditions 1 (The Approved Plans), 9 (Cycle storage), 11 (Site Enclosure), 15 (Door and Window Details), 17 (Noise Report), 19 (Grilles, lighting, alarms), 20 (Acoustic Screening to Roof, Design) and 22 (Acoustic Screening to Roof, Materials) of planning permission reference 19/3899/S73 dated 10/09/2019 for 'Partial demolition of existing buildings, including rear extensions and link building and removal of external ramps and other additions. Construction of new extensions to the rear and west of the retained existing buildings and creation of external playground. Internal works of repair, maintenance and restoration to listed buildings. Removal of existing hardstanding and creation of new access road, car parking and site wide landscaping.' Amendment to include, alterations to the form of cycle storage, additional sections of fencing and gates to front of building, revisions to glazed entrance screen, details to roof plant and acoustic and visual screens
Al-Murtaza 58 The Bishops Avenue London N2 0BE
Variation of condition 1 (Approved Plans) pursuant to planning permission 19/3449/FUL dated 30/01/2020 for `Partial demolition of the existing building (use class C3) and construction of a part 4 storey (3 above ground), part 2 storey building with accommodation in the roof space and basement car parking, to provide an elderly care home (use class C2) with up to 96 units and associated communal areas, amenity space, refuse/ recycling storage and cycle storage. Provision of 32 no. off-street parking spaces within the basement, accessed via car lifts, and six further spaces above ground. ` Amendments include: Taking down and rebuilding of the previously retained front façade. Alterations to building footprint and envelope resulting in overall reduction in floor area above ground. Increase of parapet level of rear wing to reduce impact on tree RPAs. Internal reconfiguration of floor plans. Addition of Passenger lift. Addition of open stair between Ground Floor to Lower Ground Floor. Omission of escape stair. Changes to fenestration to suit daylighting requirements. replacement of Juliette balconies/balustrading with normal casement windows for operational reasons, addition of Brises soleil to south-facing courtyard elevation to improve environmental performance. External render replaced with reconstituted stone facing and other changes to the typical bay detail. Gateways to The Bishops Avenue widened to accommodate delivery vehicles, ambulances and private refuse collection from within the site. Addition of external substation, generator, covered cycle store, refuse store and buggy store.