Rear Of 260 Knight's Hill London SE27 0QA
Variation of condition 2 (approved plans) of Planning Permission Ref: 20/02581/FUL (Erection of 2 x 3-storey terraces with roof top amenity space to provide 8 dwellinghouses and erection of a detached 2-storey building with basement to provide 130sqm of office (Use Class B1(a)) and a self-contained flat at first floor (Use Class C3), together with the provision of car parking spaces, cycle parking, refuse storage and landscaping. This application is a DEPARTURE APPLICATION: The proposed development is a departure from Policy E4 and Policy E7 of the London Plan 2021.) granted on 26.08.2021 Variation Sought: The revision is an alteration to part of the north facing wall of Block C at first floor level so that it is vertical on the boundary. The alterations are minor adjustments to remedy inconsistencies in the original design of the building known as Block C which consists of an office at ground and basement and an apartment at first floor.
Agnes House 89 Hyde Road South Croydon CR2 9NS
Variation of condition 2 (plans) attached to permission 20/00108/FUL dated 22/02/21 (as amended by NMA application 22/01408/NMA) for the Demolition of existing two-storey dwelling and erection of a four/five storey (including excavation and lower ground level) building comprising of 9 residential flats, hard and soft landscaping, boundary treatment, land level alterations, undercroft and external car parking, private/communal/play space and internal refuse/cycle storage. The effect of the variation is to add a ventilation shaft to the roof of the building and a smoke shaft to the communal hallway on each floor.
Site Of Uplands House Hotel Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (plans) attached to 22/06495/VCDN (Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing a mix of 1-bed, 2-bed & 3- bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights)
58 Reddown Road Coulsdon CR5 1AX
Variation of Condition 12 (Accessible Units) attached to planning permission ref. 20/02726/FUL for the demolition of single storey detached side garage and erection of a two/storey (with lower ground floor level and roof accommodation) building comprising 3 self-contained flats; new vehicular crossovers to facilitate vehicular parking for the host and new property; hard and soft landscaping; land level alterations; boundary treatment; private/communal/play space; refuse and cycle provision; demolition of single storey side conservatory extension and partial two storey side extension to the host property.
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire
Variation of condition 2 (approved plans) attached to pp 21/08526/VCDN attached to 20/07678/VCDN (Variation of conditions 2 (Approved Plans), 5 (Landscaping scheme/planting strategy), 8 (lighting), 9 (Agreed Highways: surface water), 13 (Approved SUDs condition), 17 (Footpath beside Four Ashes Road), 20 (Cycle and refuse storage) and 24 (Balcony details) attached to PP 20/06254/VCDN (Variation of condition 2 (plan) and 5 (Masterplan and planting strategy) attached to PP 20/05272/VCDN (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for 1 metre extension of the approved conservatories of Block G and the change of their roof to a sedum flat roof with two kerb rooflights
Development Site Adjoining St Andrew's Vicarage Julien Road Coulsdon
Variation of Condition 2 (Approved Drawings) of planning permission 20/00040/FUL dated 15/04/2020 for "Erection of a part two; part three storey building comprising 8 self-contained flats (3x1 bed, 3x2 bed and 2x3 bed) including excavation of basement level for vehicular parking and cycle storage; hard and soft landscaping; amenity/communal and play space; refuse provision; boundary treatment; alterations to land levels; internal lift and formation of vehicular crossover along Woodmansterne Road." The variation seeks a single storey extension to the building (flat 3) with a green roof and replacement side (north) window with a door.