Facuity of Arts Humanities Cox Street Coventry CV1 5QT Coventry
Variation of conditions 5-tree pit details and timescales associated with tree planting and 14-to amend soft landscaping drawings: imposed on planning permission FUL/2019/1563 for demolition of the Bugatti Building and erection of a part four and part five-storey extension (class D1 use); various internal and external alterations to the Maurice Foss and Graham Sutherland Buildings; alterations to the service yard; landscaping and associated works.
The Charter House London Road Coventry CV1 2JR Coventry
Variation of condition 2 (to amend drawings to enable alterations to the wall finishes to the Medieval corridor known as reference G09, enhancements to the display of the existing second floor Medieval roof beams, and amendments to the location of the supporting beam for the fire shutter in the areas known as reference G01/G17) imposed on application reference FUL/2017/3074, granted on 27th February 2018 for the erection of single storey front extension.
73 Kenilworth Road Coventry CV4 7AF Coventry
Submission of minor material amendment to vary condition 2 (approved drawing number condition) to allow minor alteration to the two-storey side and rear extension including omission of a rear bedroom and extending the rear balcony, alterations to both sides' single storey element together with internal alterations to approved permission HH/2019/1386 for erection of two storey side and rear extensions with full internal alterations and front facade retention.
Sandy Lane Business Park Unit 3 & 4 Sandy Lane Coventry CV1 4DQ Coventry
Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.)