90-92 Blackfriars Road London Southwark SE1 8HW
Non-material amendment to condition 2 (approved plans) of planning permission dated 18.08.2015 ref. 14/AP/2922 for: "Variation of Condition 2 (approved plans) of planning permission 12/AP/3558 dated 04/06/2013 for the 'Demolition of existing buildings and erection of a replacement building of five to eight storeys in height (max height of 27.5m), plus basement, comprising 53 residential units, 633 sqms of retail floorspace (Use Class A1) and 767 sqms of office floorspace (Use Class B1), disabled parking spaces and roof top landscaped amenity areas'. Proposed changes incorporate: - Alterations to internal floor plan layouts and core layouts. - Realignment of window and door positions to correct inaccuracies with plans. - Removal of brick pillars to balconies and provision of opaque glass balconies. - Increase in height of building by 150mm to accommodate lift overrun. - Increase in A1 floorspace from 643.2sqm to 721.9sqm. - Reduction in B1 floorspace from 670.3 to 645.64sqm. - Alteration to building line/arrangement at Ufford Street/Boundary Row junction." The non-material amendment comprises the extension of the existing plant enclosure located on the seventh floor of Block B to accommodate an additional condenser unit to support the operation of the commercial uses.
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 6 - scale 1:5, 1:10 or 1:20 section detailed-drawings of the elements required by planning permission dated 29/11/2018 [LBS Ref 18/AP/2840] 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts',
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 3 - External materials, as required by planning permission 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Application for approval of details subject to condition 17 (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow alterations to plans and design statement) to allow for avoidance of major structural changes internally and utilize existing car levels) of planning approval ref: 20/05272/VCDN
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of condition 4 (Construction Management Plan) of planning permission ref. 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 8 - Partial discharge of detailed drawings of a hard and soft landscaping scheme required by planning permission dated 29/11/2018 [LBS Ref 18/AP/2840] for 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts'.