2 Cooke Road Gisleham Lowestoft Suffolk NR33 7NA
Discharge of Condition Nos. 3, 4, 5, 6 and 7 of DC/22/0032/FUL - New build of a used car sales office pavilion & renovation and extension of a secondary Audi used car sales building, including upgrading of site landscaping & parking - Desk study and site reconnaissance
Cavell Manor Bredfield Road Melton Woodbridge Suffolk IP12 1JB
Discharge of Condition Nos. 21, 22, 23, 25, 30, 31 and 32 of DC/18/1470/VOC - Variation of condition 2 of DC/15/4290/FUL - Demolition of existing vacant depot buildings and residential property. Construction of a new residential care home providing 55 bedrooms, ancillary accommodation including staff offices, kitchen, laundry, together with associated parking, hard and soft landscaping (Revised scheme). Condition Number(s): 2 Conditions(s) Removal:To substitute amended plans. To substitute the following drawings for those approved: 81K, 82K, 83L, 84D, 85C, 86D, 88, 920F
Cavell Manor Bredfield Road Melton Woodbridge Suffolk IP12 1JB
Discharge of condition(s) 19 & 35 of application DC/18/1470/VOC - Variation of condition 2 of DC/15/4290/FUL - Demolition of existing vacant depot buildings and residential property. Construction of a new residential care home providing 55 bedrooms, ancillary accommodation including staff offices, kitchen, laundry, together with associated parking, hard and soft landscaping (Revised scheme). Condition Number(s): 2 Conditions(s) Removal:To substitute amended plans. To substitute the following drawings for those approved: 81K, 82K, 83L, 84D, 85C, 86D, 88, 920F
Depot Bredfield Road Melton Suffolk IP12 1JB
Discharge of Condition Nos 13, 17 and 36 of DC/18/1470/VOC - Demolition of existing vacant depot buildings and residential property. Construction of a new residential care home providing 55 bedrooms, ancillary accommodation including staff offices, kitchen, laundry, together with associated parking, hard and soft landscaping - Gates shall be set back a minimum distance of 10 metres from the edge of the carriageway and shall open only into the site and not over any area of the highway, Gates, fencing walls and other means of enclosure and details of fire hydrants
Cavell Manor Bredfield Road Melton Woodbridge IP12 1JB
Discharge of Condition 18 of DC/18/1470/VOC - Demolition of existing vacant depot buildings and residential property. Construction of a new residential care home providing 55 bedrooms, ancillary accommodation including staff offices, kitchen, laundry, together with associated parking, hard and soft landscaping.
Part Former Water Works Bredfield Road Melton Suffolk
Discharge of Condition No.10 of DC/16/1979/FUL - Extra Care development comprising 2 townhouses and 6 self-contained apartments with parking and access provisions (existing office building to be demolished) - Hard and Soft Landscaping details
Sizewell B Sizewell Power Station Sizewell Power Station Road Sizewell Leiston Suffolk IP16 4EU
Discharge of Condition No. 20 of DC/19/1637/FUL- 1. In outline, comprising a Visitor Centre (maximum 2,000sq.m GEA) and a maximum of 9,500sq.m (GEA) of floorspace to provide administration, storage, welfare and canteen facilities with all matters reserved apart from access. 2. In full, for the demolition of the existing Outage Store, Laydown Area, Operations Training Centre, Technical Training Facility, Visitor Centre, and Rosery Cottage garage; removal of technical training and pool car park (63 spaces), Coronation Wood car park (21 spaces), Visitor Centre car park (16 spaces) and northern outage car park (576 spaces); meantime use of the Technical Training Centre as an interim Visitor Centre followed by its demolition; and erection of new (all floorspace in GEA) Outage Store (2,778sq.m), Laydown Area (11,990sq.m) including New Western Access Road, Yardman's Office (23sq.m), Training Centre (4,032sq.m), Rosery Cottage garage (30sq.m), Replacement Car Park (2,363sq.m) providing 112 spaces, and Outage Car Park (15,525sq.m) providing (576 spaces) including new access road (and alternative access to bridleway), footpath and amended junction at Sizewell Gap; and associated landscaping earthworks/recontouring, tree felling and boundary treatment. - programme of archaeological work
59-61 College Road Framlingham Suffolk IP13 9EU
Discharge of Condition Nos. 4, 7 and 8 of DC/19/3650/FUL - Change of use and conversion of part of existing building, formally used as offices to create a new two bedroom flat - plus miner alterations to the remaining building - manoeuvring and parking of vehicles, and secure cycle storage details, Appropriate lighting details and landscaping details
Sizewell B Power Station Complex And Adjoining Land Sizewell Power Station Road Sizewell Leiston Suffolk IP16 4UR
Discharge of Condition(s) 4, 9, 11, 13, 15, 17, 18 and 23 (some in part) on planning permission DC/19/1637/FUL (1. In outline, comprising a Visitor Centre (maximum 2,000sq.m GEA) and a maximum of 9,500sq.m (GEA) of floorspace to provide administration, storage, welfare and canteen facilities with all matters reserved apart from access. 2. In full, for the demolition of the existing Outage Store, Laydown Area, Operations Training Centre, Technical Training Facility, Visitor Centre, and Rosery Cottage garage; removal of technical training and pool car park (63 spaces), Coronation Wood car park (21 spaces), Visitor Centre car park (16 spaces) and northern outage car park (576 spaces); meantime use of the Technical Training Centre as an interim Visitor Centre followed by its demolition; and erection of new (all floorspace in GEA) Outage Store (2,778sq.m), Laydown Area (11,990sq.m) including New Western Access Road, Yardman's Office (23sq.m), Training Centre (4,032sq.m), Rosery Cottage garage (30sq.m), Replacement Car Park (2,363sq.m) providing 112 spaces, and Outage Car Park (15,525sq.m) providing (576 spaces) including new access road (and alternative access to bridleway), footpath and amended junction at Sizewell Gap; and associated landscaping earthworks/recontouring, tree felling and boundary treatment.)
Bt 4 Acres Site Land Adjoining Lenacres Felixstowe Road Brightwell IP10 0BH
Details as required by conditions 3, 6, 7, 8, 9, 10, 11, 13, 16 & 17 of DC/20/1412/FUL (Removal of a number of existing single storey buildings on site and the creation of a new two storey 'Innovation Centre' Building, a new single storey Office and amenity building, a single storey 'mock up' street, and extend an existing Storage building, along with associated landscaping.)