19 Leigham Avenue London Lambeth SW16 2PT
Approval of details pursuant to conditions 9 (basement method statement and flood risk assessment) and 10 (construction methodology) of planning permission 19/02024/FUL (Change of use and conversion of the existing building involving demolition of the rear building, excavation to create a basement with lightwells, erection of dormer windows in the rear elevation in connection with conversion of existing loft to habitable floorspace and the erection of 2 storey rear extension (new building) and a 2 storey side extension with undercroft to provide 400sqm of Office floorspace (Use Class B1(a)) at basement and ground floor levels and 8 residential units (Use Class C3) at part ground floor and on the upper floors together with the provision of 2 parking spaces, cycle/refuse stores and new boundary treatments) granted on 19.03.2020.
4 - 5 Hutton Terrace, Newcastle Upon Tyne,
Change of use from offices (Class E) to 7 no. flats (Class C3), erection of 3-storey extension following demolition of existing two storey off-shot and staircase; erection of boundary wall/fence to rear max height 1.8 metres, insertion of 8 rooflights, alterations to elevations, provision of cycle and bin store to rear - (AMENDED DESCRIPTION)
Oval House Kennington Oval London SE11 5SW
Approval of details pursuant to Condition 3 (Air Quality & Dust Management Plan) of planning permission 18/04183/FUL (Application for Full Planning Permission and Listed Building Consent for the demolition of the existing Oval House Theatre and the construction of a part five part six storey hotel building (Use Class C1), comprising 95 bedrooms, ancillary bar and restaurant and associated landscaping, servicing, on-site parking and new boundary treatment; and refurbishment of the Grade II listed White House building consisting of the replacement of a modern single storey rear extension, the removal of modern internal partitions, change of use of lower floors of the White House from ancillary theatre office (sui generis) to office (Use Class B1a) and the change of use of the second floor from office (Use Class B1a) to temporary residential accommodation (Sui Generis) ) granted on 21.06.2019.
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Application for approval of details subject to condition 17 (Variation of condition 2 (plans) and 5 (masterplan and planting strategy) attached to PP 19/05741/VCDN (Variation of condition 2 (plan numbers) attached to PP 16/05053/FUL - (Demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide 54 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (67 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow alterations to plans and design statement) to allow for avoidance of major structural changes internally and utilize existing car levels) of planning approval ref: 20/05272/VCDN
19 Leigham Avenue London SW16 2PT
Approval of details pursuant to conditions 3 (Schedule of Materials) and 11 (Sustainability Statement) of planning permission 19/02024/FUL (Change of use and conversion of the existing building involving demolition of the rear building, excavation to create a basement with lightwells, erection of dormer windows in the rear elevation in connection with conversion of existing loft to habitable floorspace and the erection of 2 storey rear extension (new building) and a 2 storey side extension with undercroft to provide 400sqm of Office floorspace (Use Class B1(a)) at basement and ground floor levels and 8 residential units (Use Class C3) at part ground floor and on the upper floors together with the provision of 2 parking spaces, cycle/refuse stores and new boundary treatments) granted on 13.03.2020.