The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 19 (Co2 & Water) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for Conditions 13 (Part M4 (2)) and 18 (Sustainable Drainage) of planning permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts)
154-166 Clapham High Street And 162 Stonhouse Street London SW4
Approval of details pursuant to condition 31 (Design Stage SAP and SBEM) of Planning Permission Ref: 21/00200/VOC (Variation of Condition 2 (approved plans) of planning permission 18/01832/FUL (Retention of ground floor commercial units, part change of use from Use Class A1 (shops) to use Class C3 (residential) on upper floors and part of ground floor (rear part), and alterations including excavation to form a basement to Nos. 156-158 Clapham High Street, the demolition of existing 1-3 storey rear extensions and erection of replacement part 3 part 4 rear and side extensions to provide 28 residential units (Use Class C3) with shared amenity space, landscaping and associated works) granted 27.11.2020.) granted on 10.11.2021
154-166 Clapham High Street And 162 Stonhouse Street London SW4
Approval of details pursuant to the discharge of conditions 22 (internal and external plant equipment) of Planning Permission 21/00200/VOC "Variation of Condition 2 (approved plans) of planning permission 18/01832/FUL (Retention of ground floor commercial units, part change of use from Use Class A1 (shops) to use Class C3 (residential) on upper floors and part of ground floor (rear part), and alterations including excavation to form a basement to Nos. 156-158 Clapham High Street, the demolition of existing 1-3 storey rear extensions and erection of replacement part 3 part 4 rear and side extensions to provide 28 residential units (Use Class C3) with shared amenity space, landscaping and associated works) granted 27.11.2020." granted on 10.11.2021
154-166 Clapham High Street And 162 Stonhouse Street London SW4
Approval of details pursuant to conditions 17 (SUDS management system), 18 (Drainage details) and 23 (Noise Attenuation) and partial approval of Condition 21 (Acoustic Impact of Servicing Plant) of planning permission ref. 21/00200/VOC (Variation of Condition 2 (approved plans) of planning permission 18/01832/FUL (Retention of ground floor commercial units, part change of use from Use Class A1 (shops) to use Class C3 (residential) on upper floors and part of ground floor (rear part), and alterations including excavation to form a basement to Nos. 156-158 Clapham High Street, the demolition of existing 1-3 storey rear extensions and erection of replacement part 3 part 4 rear and side extensions to provide 28 residential units (Use Class C3) with shared amenity space, landscaping and associated works) granted 27.11.2020.). Granted on 10.11.2021.
The Fountain 120 Malden Road New Malden KT3 6DD
Details required for condition 11 (Secured by Design) of planninng permission 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 6 - scale 1:5, 1:10 or 1:20 section detailed-drawings of the elements required by planning permission dated 29/11/2018 [LBS Ref 18/AP/2840] 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts',
12 Oaklands Business Centre Oaklands Park Wokingham RG41 2FD
Application to vary condition 5 of planning consent 200428 for the Full application for proposed roof extension to provide 5. no (4 x 2 beds and 1 x 1 bed)residential apartments, erection of single storey front extension to form new entrance porch following removal of existing metal fascia, alterations to existing fenestration including addition of glass balustrades and 10 no. additional doors at ground floor level, plus removal of existing external metal staircase. Condition 5 refers to landscaping and the variation is to add a water booster.
30 Southbank Central Stamford Street London Southwark SE1 9LS
Details of Condition 1 (Landscaping details), as required by planning permission 15/AP/2511 (Variation of condition 2 (approved plans) of planning permission 11/AP/3797 (granted on 13 March 2012) for the refurbishment and recladding of the tower and podium buildings, erection of six additional storeys to the tower for residential use and change of use of floors 11 to 30 of the tower from offices to residential, erection of a series of extensions and additions for office use and creation of retail space, pool and gym on the ground floor, and formation of a new pedestrian route linking Stamford Street to Upper Ground. The amendments consist of: i. alteration and enlargement of the Stamford Street offices ii. alteration and enlargement of the tower office entrance on Hatfields; iii. introduction of new internal accommodation stair to tower; iv. extension of retail units 4 (fronting Hatfields) and 7 (within new pedestrian route); v. subdivision of retail unit 5 (within new pedestrian route); vi. revised design and layout for the 7th floor Stamford Street office roof terrace.)
The Fountain 120 Malden Road New Malden KT3 6DD
Details required by Condition 10 (Levels of Buildings, Roads, Parking Areas and Pathways) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.)