Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of (8) Landscape Plan, (10) Ecological Management Plan, (17) Code of Construction Practice, (16) Onshore Written Scheme of Investigation (18) Construction Traffic Management Plan
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of Ecological Management Plan (10), Construction Traffic Management Plan (18), Onshore Written Scheme of Investigation (16), Landscape Plan (8) & Code of Construction Practice (17): for Pre-construction Environmental Surveys and Pre-construction Land Drainage Surveys
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of Landscaping (8), Ecological Management Plan (10), Onshore Archaeology (16), Code of Construction Practice (17) and Construction Traffic Management Plan (18) - For pre-construction Archaeological Investigations
Lime Tree Farm Tunstall Road Blaxhall Suffolk IP12 2DY
Discharge of Conditions Nos. 3 and 4 of DC/20/2216/AGO - Prior Notification - Construction of a clay lined winter storage irrigation reservoir. A balanced cut and fill earth moving operation will dig the clay from the site and engineer it into an impermeable membrane to line the irrigation reservoir proposed. No materials will be brought to or taken from site. The very wide banks have allowed the reservoir to sit very low in the landscape and provide a landscaping benefit to hide the un landscaped banks of the existing reservoir to the south. Why necessary for agriculture: Langmead Farms have secured 330,000 m3 of winter water abstraction licence from the Environment Agency to allow an expansion of the vegetable and herb growing side of the business. This project represents phase 2 of the winter storage required, The Knolls 180,000 m3 reservoir immediately to the south represents Phase 1. Why designed for agriculture: The infrastructure has been installed to provide a high pressure water main around the farm to supply irrigators in every field. This was installed as part of Phase 1 when The Knolls reservoir, just to the south was constructed (Stage 2 application)
Land South Of Model Farm Long Lane Woodmansey East Riding Of Yorkshire
Discharge of Requirements 12(1) (Design Detail), 14(1) (Landscape Plan), 18(1) and 19(1) (Surface & Foul Water Drainage), 21 and 28 (Ecological Management Plan), 22 (Code of Construction Practice) and 23(1) (Construction Environmental management Plan) for Stage 5 (Project A) Dogger Bank Creyke Beck Offshore Wind Farm Development Consent Order
Land South Of Model Farm Long Lane Woodmansey East Riding Of Yorkshire
Discharge of Requirements 12(1) (Design Detail), 14(1) (Landscape Plan), 18(1) and 19(1) (Surface & Foul Water Drainage), 21 and 28 (Ecological Management Plan), 22 (Code of Construction Practice) and 23(1) (Construction Environmental management Plan) for Stage 5 (Project B) Dogger Bank Creyke Beck Offshore Wind Farm Development Consent Order