Canada Water Masterplan - Land Bounded By Lower Road (West), Redriff Road (South), Quebec Way (East) Surrey Quays Road And Canada Water Dock (North) And Site At Roberts Close London SE16
Partial Discharge of Condition 45 (Archaelogical Reporting) in relation to plot A2 only pursant to planning permission ref no. 18/AP/1604 - Hybrid application seeking detailed planning permission for Phase 1 and outline planning permission for future phases, comprising: Outline planning permission (all matters reserved) for demolition of all existing structures and redevelopment to include a number of tall buildings comprising the following mix of uses: retail (Use Classes A1-A5), workspace (B1), hotel (C1), residential (C3), assisted living (C2), student accommodation, leisure (including a cinema)(D2), community facilities (including health and education uses)(D1), public toilets, nightclub, flexible events space, an energy centre, an interim and permanent petrol filling station, a primary electricity substation, a secondary entrance for Surrey Quays Rail Station, a Park Pavilion, landscaping including open spaces and public realm, works to Canada Water Dock, car parking, means of access, associated infrastructure and highways works, demolition or retention with alterations to the Press Hall and/or Spine Building of the Printworks; and Detailed planning permission for the following Development Plots in Phase 1: Plot A1 (south of Surrey Quays Road and west of Deal Porters Way) to provide uses comprising retail (A1-A5), workspace (B1) and 186 residential units (C3) in a 6 and 34 storey building, plus basement; Plot A2 (east of Lower Road and west of Canada Water Dock) to provide a leisure centre (D2), retail (A1-A5), and workspace (B1) in a 4, 5 and 6 storey building, plus basement; Plot K1 (east of Roberts Close) to provide 79 residential units (C3) in a 5 and 6 storey building; Interim Petrol Filling Station (north of Redriff Road and east of Lower Road) to provide a petrol filling station with kiosk, canopy and forecourt area. Each Development Plot with associated car parking, cycle parking, landscaping, public realm, plant and other relevant works.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Kingston University Kingston Hill Kingston Upon Thames KT2 7LB
Discharge of part C of Condition 8 (Details of the proposed facing materials) of planning application 19/01076/FUL (Erection of single storey building for use as a management suite and reception. Internal and external alterations to existing buildings to facilitate refurbishment of existing student accommodation, including installation of PVpanels, with associated parking and landscaping arrangements)
Kingston University Kingston Hill Kingston Upon Thames KT2 7LB
Discharge of condition 7 (Car Park Management Plan) of planning application 19/01076/FUL (Erection of single storey building for use as a management suite and reception. Internal and external alterations to existing buildings to facilitate refurbishment of existing student accommodation, including installation of PV panels, with associated parking and landscaping arrangements) dated 10/09/19.
Eagle Wharf 90-96 Peckham Hill Street London SE15 5JT
Full discharge of Condition 15 'BREEAM for the Commercial Parts of Mountview Academy' attached to planning permission 17/AP/1665 [Approval date: 05.01.2018], which itself is the most recent variation of original planning permission 16/AP/2649 [Approval date: 10.04.2017]. The development description for 17/AP/1665 reads as follows: "Minor material amendment to Condition 2 (drawings) and Condition 16 (BREEAM) of planning permission 16/AP/2649 for the construction of part three/part four/part five storey building for to provide a School of Theatre Arts comprising teaching, rehearsal and administrative accommodation and theatre (Class D1), and cafe/restaurant/bar (Class A3/A4) with associated landscaping to Peckham Square and Peckham Hill Street. Provision of new vehicular access from Peckham Hill Street with associated servicing, disabled parking, cycle and refuse storage areas. The proposed amendments are as follows: - Alterations to the design and materials of the elevations of the consented building; - Change the timing of submission of BREEAM certification until 3 months post practical completion".