Adjoining Borough Observations Within Southwark
Observations on a proposed development within the adjoining Borough of Southwark with respect to: Demolition of the Michael Rutter Centre, Mapother House and Professorial Building and construction of 3 new buildings fronting De Crespigny Park ranging from 5-8 storeys plus plant to create 189 one, two and three bedroom dwellings (use class C3). Creation of a nursery facility at ground floor level complete with secure outside playspace. Creation of communal gardens, play areas for children, cycle parking and other associated alterations and improvements to infrastructure. Creation of a new pedestrian walkway to the east of the site with stairs and platform lift to improve connections to De Crespigny Park. At: Mapother House, Maudsley Hospital, De Crespigny Park
Keybridge House South Lambeth Road London Lambeth SW8 1RG
Approval of details pursuant to conditions 57 (BREEAM Post-construction certificate - Offices) and 59 (BREEAM Post-construction certificate - Retail Units) of planning permission 16/05036/VOC (Variation of Condition 1 (Approved Plans) and 44,45,46,47,48,49,50,51,52,53 (SAP Calculations), and 56,57,58,59 (BREEAM) of planning permission ref. 13/03935/OUT (Demolition of existing buildings on the site and retention of basement to provide a mixed use development comprising full planning permission for 5 blocks (of 4, 9 (2no), 22 and 36 storeys) which includes 415 dwellings (Class C3), 2,652 sqm GIA employment floorspace (Class B1), 802 sqm GIA retail (Class A1- A5) associated basement car parking, storage and servicing, new public realm and open space; and outline planning permission for a two form of entry primary school (Class D1) 8,600 sqm GEA (maximum) and associated servicing and means of access) granted on 26.01.2017.