Zoons Court Farmhouse Larkhay Road Hucclecote Gloucester Gloucestershire GL3 3NP
Demolition of existing workshop and the erection of a new outbuilding containing ancillary living accommodation and a home office/ workshop for use in association with Zoons Court Farmhouse.
Owls Barn Dorney Wood Road Burnham Buckinghamshire SL1 8EH
Demolition of existing garages and barn used as gym/office. Construction of garages with loft accommodation and an outbuilding for gym/home office.
Halton Grange And Halton Grange Cottage Front Street Wall Hexham Northumberland NE46 4EE
Rearrangement of existing annex accommodation to North portion of house with associated alterations and ground floor extension. Existing garage rearranged to provide internal lift and renewable energy plant rooms. Pitched roof extension to North East of house to create double garage and master bedroom over. Infill extension including modified gable at first floor level on East elevation to form link to annex. Extension on West elevation to include flat roof and rooflights. Demolition of field shelter. Replace garden office. Create entrance lobby, infill main door to house. Infill of previous recessed entrance area. Removal of three trees (amended 22.11.2022)
The Lodge Goose Track Lane West Lilling YO60 6RR
'Erection of detached 3 bay garage building with first-floor accommodation to form 1no. two bedroom annexe following demolition of existing building and change of use of stable to allow use as a home office to include the installation of 2no. roof lights to the front elevation and 2no. replacement roof lights to the rear elevation
Land At St Mary's Complex Waverley Street Bootle L20 4AP
Application for hybrid planning permission for three phased development of SAFE St Mary's complex building, vacant land to the South and East bounded by railway line and canal basin; full planning permission is sought for phases one and two as follows; phase one included the demolition of the existing buildings on site and the development of a three storey arts hub building comprising accommodation for SAFE, flexible office/studio/meeting spaces, day nursery and multipurpose hall space alongside the erection of canal side pods for community use (Use Class E), the remodelling and extension of the existing Lock and Quay public house to create bed and breakfast facility, serviced apartments and commercial/training unit (Use Class E) relocated from existing SAFE complex and associated parking. Phase two includes the development of mixed tenure housing including 41 No. 2 and 3 bedroom, two and three storey townhouses and a four-storey apartment block consisting of 66 No. 1 and 2 bedroomed self-contained apartments with associated parking and public realm works and the erection of a substation. Phase three seeks outline permission in respect of means of access, layout and scale for the development of four storey 80-bed extra care facility (Use Class C2) including community hairdressing salon and cafe with appearance and landscaping reserved for future consideration.