Corfu Cottage The Midway Royal Tunbridge Wells Kent TN4 8NJ
Demolition of existing stable building and construction of an underground secondary car storage area; creation of hidden parking area within existing landscaped area to rear of dwelling, with home office and gym; grading of land on western part of site with spoil from excavation; reconfiguration of existing driveway. Works to the existing dwelling comprising of a single storey rear infill extension; conversion of integral garage to habitable accommodation; removal of existing porches; reconfiguration of existing chimney; first floor front and rear extension; removal of bay windows; alterations to fenestration and installation of rooflights. Alterations to terrace and creation of outdoor swimming pool.
Cuerden Hall Shady Lane Cuerden Bamber Bridge Preston PR5 6AZ
Change of use of vacant care home (Use Class C2) to residential dwelling (Use Class C3) with associated staff and guest accommodation; internal and external repair/refurbishment works and alterations; selective demolition; extension including orangery, staircase enclosure, creation of swimming pool with glazed enclosure, and two storey extension to service buildings in south west corner of stableyard; hard and soft landscaping works including associated structures and landscape features including reinstatement of dilapidated pond; construction of gate lodges and secondary gates to access road; removal of driveway bridge crown and repair of tunnel; provision of associated car parking; together with other associated development
73 Valley Road Rickmansworth WD3 4BL
Variation of Condition 2 (Plan Numbers) of planning permission 19/2284/FUL (Demolition of existing dwelling and construction of replacement dwelling with accommodation within roof served by rear dormer and rooflights) to relocate the garage to the other side of the house, switching with front living room, alterations to fenestration to front and rear and to include addition of 2 new window to side elevation (within new garage location) and insertion of new external doors and inclusion of schedule of external materials