Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
Development Site At 14 To 17 Paddington Green London
Amendments to planning permission dated 5th January 2023 (RN:22/03790/FULL) for Variation of condition 1 of planning permission dated 29 March 2019 (RN: 18/08004/FULL), which itself Varied condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 15 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY the removal of the loggia/covered walkway area between Blocks G and H, the re-design of the layout of the restaurant at the ground floor of Block H and design changes to the façade/elevation of the restaurant extension.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 01 October 2021 (RN: 20/06914/FULL) for the: Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY, to allow alterations to facade of 19- 35 Baker Street- Baker Street Office Building (Building C) at ground, first, fifth, sixth, seventh, eighth and roof level; amendments to 88-110 George Street, including 112 George Street (Building D) at lower ground floor, ground floor, first, fifth, sixth, seventh, eight and roof level; and changes to condition 42 to read : "You must apply to us for approval of a detailed external lighting strategy which includes details of all light fittings and lighting levels. You must not start any work on this part of the development until we have approved what you have sent us. You must then install all lighting in accordance with the approved external lighting strategy".
Development Site At 14 To 17 Paddington Green London
Amendments to planning permission dated 29 March 2019 (18/08004/FULL) for Variation of condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide up to 200 residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add 16 residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme. NAMELY to amend the description of development to: "Variation of condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. Namely, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme."
Dora House 60 St John's Wood Road London NW8 7HN
Amendments to planning permission dated 16th July 2021 (RN 21/02813/FULL) which was a variation of earlier permissions (20 August 2020 (20/01739/FULL and 4 November 2019 (RN: 19/01284/FULL) for Demolition of the existing building and redevelopment to provide two buildings: Building 1 comprising one basement level, ground and thirteen upper floors containing car parking, plant, affordable sheltered accommodation and market sheltered accommodation (Class C3), ancillary communal areas; Building 2 comprising sub-basement, two basement levels, ground and eleven upper floors containing plant, car parking, residential accommodation (Class C3) and ancillary leisure; reconfigured vehicular and pedestrian access together with landscaping and other works in association with the development. NAMELY, to allow amendments to Building 1: window openings from tilt and turn to side hung inward opening units; updated substation door arrangement and ventilation details; balcony rainwater pipes; alterations to layout of basement and ground floors.
Development Site At 14 To 17 Paddington Green London
Amendments to planning permission dated 29th March 2019 (RN:18/08004/FULL) for Variation of condition 1 of planning permission dated 21 December 2017 (RN:16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide up to 200 residential units, with associated landscaping, basement car and cycle parking and servicing provision, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add 16 residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme. NAMELY, to reduce Basement Level 2 and consolidation of car parking, cycle parking and plant at basement level 1, along with relocation of balcony doors to 6 units.
Development Site At 14 To 17 Paddington Green London
Amendment to the planning permission granted 29 March 2019 (RN: 18/08004/FULL) for variation of condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide up to 200 residential units, with associated landscaping, basement car and cycle parking and servicing provision. namely, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add 16 residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme. NAMELY to vary the wording of the description of development to the following: Amendment to the planning permission granted 29 March 2019 (RN: 18/08004/FULL) for variation of condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide up to 200 residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme.
Development Site At 14 To 17 Paddington Green London
Amendments to planning permission dated 29th March 2019 (RN 18/08004/FULL) for Variation of condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide up to 200 residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY, amendments to Blocks G and H.
Development Site At 143 To 147 Church St 5 Newcastle Place 11 To 13 Paddington Green And 283 - 329 Edgware Road London W2 1DH
Amendments to planning permission dated 29 March 2019 (RN: 18/08004/FULL) for the: Variation of condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide up to 200 residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY, to allow revision of tenure to block H amend 6x 1-Bedroom units across the ground to third floors within Block H from Social Rented to Intermediate tenure.
Tollgate Gardens Community Centre 17 Kilburn High Road London NW6 5SD
Amendments to planning permission dated 11 November 2020 (RN: 19/05994/FULL) for variation of Condition 18 (waste) of planning permission dated 08.05.2017 (RN: 16/06647/FULL) for variation of Condition 1 (approved plans) of planning permission dated 28 May 2014 (RN: 13/05695/COFUL) for demolition of Godwin and Wingfield Houses and ancillary garages in connection with the Estate Regeneration to provide 248 residential units within five new buildings of between 2-9 storeys and the retention of Tollgate House with associated external alterations, construction of a new single storey community centre and associated car parking, landscaping and open space. (Councils Own Development); Namely amendments to lower ground and ground floor plans and of two flats of Tollgate House, reduction in height of walkway glazing from 1.8m to 1.1m, external gas meter room and rise to Tollgate House; omission of two windows internal alterations to flats to new buildings to provide en-suites to 23 private flats. NAMELY, to allow amendments to the community centre refuse structure.