Acton Gardens Phase 6.2 Bollo Bridge Road Acton W3 8RQ
Application for a Non Material Amendment (s.96a), to allow design alterations to the Central Plaza open space pursuant to planning permission 160793RES 24.05.2016 and 160794VAR dated 09.12.2016 for 'for "Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application)'
Acton Gardens Central Plaza Phase 6 Acton W3 8DA
Application for a Non-Material Amendment in (S96a) seeking to amend the timing trigger of Condition 36, in relation to planning permission reference 160794VAR dated 09.12.2016 for 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'
Vauxhall Bus Station Bondway London
Application for a non-material amendment following a grant of Planning Permission ref : 17/04741/FUL (Redevelopment of the site involving demolition of existing bus station and erection of a 3 storey building at the northern end for bus-related operational use with part retail (Use Class A1) at ground floor level, and a single storey building at the southern end for bus-related operational use. Installation of main bus station canopy; new and replacement bus shelters; alterations to existing vent shaft and lift shaft; installation of pissoir, temporary kiosk and associated works) granted 09/02/2018. Amendment sought: Phase the development into Phase 1 and Phase 2 works Amend wording to Conditions 18 (NRMM), 19 (Construction Management Plan), 20 (Temporary Bus stops) and 28 (Tree Protection) to allow for Phase 1 works to commence prior to their discharge